Check the local lakeshore requirements
RDFFG publishes separate information for lakeshore development permits and sewage disposal near lakes. A building setback is not a universal septic-field rule. Confirm the applicable bylaw, mapped permit area and proposed work with planning staff and your authorized person.
Source: RDFFG development permits on lakes ↗Show all known water features
- Identify the exact parcel and its legal boundaries.
- Mark the lake, stream, ditch or other water feature on the available plan.
- Include known wells on and near the property.
- Keep existing sewage-system documents with the sketch.
- Describe proposed land alteration, buildings and access changes.
- Ask which field observations and measurements are still needed.
Keep well protection in the design conversation
BC’s sewerage regulation includes well-separation requirements. Have the authorized person confirm the rules and supporting assessment for the site. A single distance copied from a website is not a complete design.
Source: BC Laws / Province of British Columbia · Sewerage System Regulation, B.C. Reg. 326/2004 ↗Order after the siting questions are resolved
A smaller tank or a different product does not, by itself, solve a restricted site. Once the layout and components are specified, bring the list to Pay-N-Save for product pricing. Keep unanswered siting questions with the designer and authority.
Your preparation checklist.
Tick off what you have. Progress stays in this browser.
Sources & useful links
- RDFFG development permits on lakes ↗
- RDFFG · sewage disposal near lakes ↗
- RDFFG Zoning Bylaw 2892 — consolidated text ↗
- BC Laws / Province of British Columbia · Sewerage System Regulation, B.C. Reg. 326/2004 ↗
Public-source check: October 15, 2026. Confirm current requirements with the responsible authority. About these guides.